Control which time or frequency step is displayed for dynamic response
data.
-
In the Project Tree, click on a dynamics analysis
branch to open the Analysis Workbench.
-
On the Analysis workbench toolbar, click the
(Results plot) icon.
-
Choose the desired results type from the menu.
The Dynamic time response and
Legend dialogs will open. The initial display will be
set to the peak value time step.
-
In the Dynamic time response dialog, click the (Start Animation) button to display all
time/frequency steps.
-
Use the Animation time span field to narrow the animation range.
-
Move the slider to select a new starting point for the animation.
You can also use the Elapsed time field to select a start
time.
-
To return to the initial time step, click Show at
peak.
-
Click Close.